Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /www/eziklampsystems_385/public/web/wp/wp-includes/functions.php on line 6121
Case Studies | Ezi Klamp Systems
  • 9.4/10 positive customer feedback
  • Hands-on experience & can-do attitude
  • Fast turnaround from drawings
  • Large stocks for immediate despatch
  • dda_handrail-scaled-e1631287565469
    Location
    Cardiff, Wales
    Duration
    10 Weeks
    Install
    October 2020
    Products
    Key Clamp Handrails, Armco Crash Barrier Roof Guardrail System

    Croesyceiliog Comprehensive School – DDA Handrail Project

    During the heat of the COVID-19 pandemic in October 2020, Ezi Klamp was contacted by Darwin Group to help supply & install a number of safety solutions to the newly

    Google Rating
    4.7
    Based on 61 reviews
    js_loader